| Availability: | |
|---|---|
| Quantity: | |
Product Description

Made from carbon steel, alloy steel, or stainless steel to handle heavy loads (up to 10,000 kg/m in mining).
Precision bearings (deep groove, tapered, or spherical) for smooth rotation.
Sealed & lubricated (IP65/IP66) to resist dust, water, and corrosion.
Low rotational resistance (≤1.5% of load weight) reduces power consumption.
Diameter: 89mm, 108mm, 133mm, 159mm, 194mm, 219mm
Length: 150mm–3,000mm (matched to belt width)
Special Coatings: Rubber, ceramic, or polyurethane for wear resistance.
Modular design for quick replacement.
Interchangeable with most conveyor systems.
Technical Parameters
| Description |
| Standard JIS / CEMA / DIN / ISO |
| Bearing 6204~6308 2RS |
| Seals labyrinth |
| Roller Diameter. Ø60~Ø159mm [Ø2.4"~Ø6.25"] |
| Size be customized |
Product Uses
Carrying rollers-Product Uses
Supports heavy ore, coal, and aggregates.
Recommended Roller: Heavy-duty steel troughing rollers with rubber disc buffers.
Handles limestone, clinker, and cement powder.
Recommended Roller: Heat-resistant rollers (up to 150°C).
Used in ship loaders/unloaders for bulk cargo.
Recommended Roller: Stainless steel or galvanized rollers (saltwater-resistant).
Transports iron ore, sinter, and slag.
Recommended Roller: Ceramic-lined rollers for extreme abrasion.
Hygienic transport of flour, sugar, and cereals.
Recommended Roller: Stainless steel 304/316 (food-grade).
Handles MSW, plastics, and shredded scrap.
Recommended Roller: Self-cleaning spiral rollers.
FAQ
1 Q: Is AXSON a factory or a trading company?
A; AXSON is a factory.
2 Q: How long is the warranty period?
A; The warranty period for the equipment is 12 months from the Bill of Lading (B/L) date, with a 6-month warranty for spare parts (excluding wear parts).
3 Q:What is the payment terms?
A; 30% deposit by TT, with the remaining 70% payable before shipment or against copy of Bill of Lading (B/L).
4 Q: How long is your delivery time?
A; If items are in stock, shipment will be made within 7-10 days. For made-to-order production, the lead time is 30 days.